I have 1 tech and 2 bays.I have 1 auto repair tech and 1 glass tech and Iam the glass tech.The other 4 bays are going out back of my shop.I did all the work excavating,grade work,and I poured the 40 foot bey 60 foot foundation.It is ready for the slab.Just waiting for more money to come in (out of pocket).So I have 1 csr (Customer service rep).1 auto repair tech and me the auto glass tech.